Plantation Harvesting: Hazelwood North
Harvesting Notification – Hazelwood North
HVP Plantations (HVP) will be harvesting pine plantation at Hazelwood North along Clarkes Road in May 2025.
Harvesting
Approximate dates that harvesting will be conducted are starting mid May 2025 for a period of 2-3 weeks.
The map below shows the areas that will be closed for public safety. HVP will also erect warning signage and barriers around the operating area to delineate the areas closed. The closure will be in effect 24 hours, 7 days per week, for the duration of the operation, as the risk to public safety is still present when machines are not operating in the area.
Neighbours directly adjoining the operations will be advised via letter drop prior to operations commencing.
Safety
HVP takes safety seriously, please note the following:
- Worksites are hazardous, and risks to people’s safety are not always obvious.
- The worksites are closed (to vehicles and pedestrians) for the duration of the operations. This includes when the crew is not present.
- Be aware of increased heavy vehicle traffic and machinery.
Thank you for following the directions of all signage and forest operators.
Haulage
Logs from this operation will be delivered to local timber processors, including the nearby Maryvale paper mill. Log transport will be via Clarkes Road to Sanders Road.
Area of plantation being harvested at Hazelwood North (click to enlarge).
Community recreation
HVP recognise that many community members have an affinity with our forests, and enjoy walking, running and bike-riding activities throughout the year. Before entering any plantations, please apply for a Human Powered Pass. It is a condition of this Pass to remain outside of closed areas.
For more information
For further information, to provide feedback, or to become a stakeholder, please:
- contact our Churchill office: phone (03) 5122 0600; or
- message HVP via our contact page.
©2025 Hancock Victorian Plantations